Key Steps After Communication Tower Installation: Commissioning And Acceptance

Feb 08, 2026

Leave a message

1. System Debugging: After all hardware is installed, power-on debugging is required. This includes checking the VSWR of the antenna system to ensure high signal transmission efficiency and low reflection loss; adjusting the antenna angle to optimize coverage; and co-firing with other network nodes to ensure smooth data transmission.

 

2. Project Acceptance: This is a thorough "check-up." It typically involves multiple parties, including the client, designer, and contractor. Acceptance includes: checking that all construction conforms to design drawings and specifications; verifying steel material certificates, bolt torque records, concrete strength reports, and other documents; and conducting on-site measurements and tests. Only when all items pass the inspection is the entire installation project officially completed.